TO: Mayor and City Commission
FROM: Cale Curtis, City Manager
DATE: September 18, 2024
Title
A RESOLUTION OF THE CITY OF MARGATE, FLORIDA, AWARDING CONTRACT ENTITLED "WATER MAINS IMPROVEMENTS PHASE 2B - US 441 & ROYAL PALM BLVD INTERSECTION" TO PABON ENGINEERING, INC. IN THE AMOUNT OF $650,000.00; PROVIDING FOR A PUBLIC PURPOSE; PROVIDING FOR AN EFFECTIVE DATE.
Body
BACKGROUND:
The Asbestos Concrete (AC) water mains in the City of Margate are at the end of their serviceable life. As a result, there have been a significant number of water main breaks which reduces the reliability of the distribution system. The Royal Palm Boulevard (RPB)/ US 441 intersection project was originally included with the replacement of water mains on Royal Palm Boulevard (Phase 2B), but was excised and accelerated as a result of FDOT plans to commence an improvement project at the intersection by the end of 2024. In addition to mast arms, FDOT plans on widening and milling and resurfacing the intersection. It is imperative that the aged water mains are replaced in this intersection before FDOT commences their project.
EVALUATION OF BIDS:
A public advertisement was placed in the Sun Sentinel on July 26, 2024, and after a non-mandatory pre-bid meeting on August 20, 2024, addendum # 1 was issued (see Background information), and three (3) construction bids were received on the bid due date of August 29, 2024. The bids ranged from a low of $650,000.00 (Pabon Engineering Inc. (Pabon)) to a high of $1,118,724.10 (Southern Underground Inc.), and a difference of $468,724.10 separated the low bid from the high. The signed bid from Pabon is included in the Background information. The second low bid was submitted by Mardan Inc., who is currently working on Water Mains Improvement Phase 2A. Marcdan Inc.'s price was about $100,000 higher than the low bid. The bid results are included in the Background information.
The Engineer of Record (EOR), Chen Moore & Associates (CMA) compared t...