File #: ID 14-1398    Version: 1 Name:
Type: Resolution Status: Passed
File created: 9/29/2015 In control: Regular City Commission Meeting
On agenda: 10/7/2015 Final action: 10/7/2015
Title: APPROVING SUBMITTAL OF TWO WATER QUALITY IMPROVEMENT PROJECTS TO THE STATE LEGISLATURE FOR STATE APPROPRIATION CONSIDERATION.
Attachments: 1. RESOLUTION, 2. BACKGROUND

 

TO:                     Mayor and City Commission

 

FROM:                     Douglas E. Smith, City Manager

 

DATE:                     October 7, 2015

 

 

Title

APPROVING SUBMITTAL OF TWO WATER QUALITY IMPROVEMENT PROJECTS TO THE STATE LEGISLATURE FOR STATE APPROPRIATION CONSIDERATION.

 

Body

 

BACKGROUND:                                          In Fiscal Year 2014, the City of Margate submitted one project to the State Legislature for appropriation consideration. Phase I of the Sewer Piping Rehabilitation Project received $100,000 as part of the State’s 2014-2015 General Appropriations Act. The City submitted two water quality improvement projects in 2015, however, these projects were included on the Governor’s veto list. In preparation for the 2016 State Legislative Session, City staff has identified two projects in which it would like to seek appropriations from the State to fund in part or whole:

                     Sewer Piping Rehabilitation Phase II: This project is for a designated sanitary sewer basin (No. 1). The rehabilitation scope will include video survey of the entire basin piping and installation of cured-in-place pipe to repair the leaks.  In addition to the water quality protection and general environmental benefits, the cured-in-place lining of sewer pipes is a cost effective alternative to replacement.  This process eliminates roadway and private property restoration; does not inconvenience residents; and eliminates environmental impacts typical for a construction site such as Noise, Dust, Traffic Control, etc. The City is requesting funding in the amount of $400,000.

                     Lemon Tree Lake Water Quality Improvement Project: This project is for the evaluation of the water quality of the runoff from the industrial area along NW 8th Street discharging into Lemon Tree Lake; confirm the presence or absence of any pollutants in the lake sediment; identify and install engineering controls, if required, to eliminate future discharges; and develop/implement a mitigation plan to remove the polluted sediment from the lake bed, if required. This project is in correlation with the potential expansion of the lake for an improved waterfront promenade and additional storage of runoff from the new CRA developments. The funding request of $100,000 will allow for preliminary field investigations; installation of required engineering controls; and development of a mitigation plan. 

 

 

RECOMMENDATION:                     Approve.

 

 

FISCAL IMPACT:                     The Sewer Piping Rehabilitation Phase II Project is budgeted in the FY 2016 budget. If the project is not funded in part or whole by the State, the City has allocated funding in the Water and Wastewater Enterprise Fund. The Lemon Tree Lake Water Quality Improvement Project is not currently budgeted.

 

 

CONTACT PERSON:                     Reddy Chitepu, P.E., Director of DEES